Broadband5 min read

How long does broadband installation take?

By the Smart Comparison editorial team · November 2026

Compare broadband deals

Broadband installation takes from a day or two to a few weeks, depending on whether your home is already connected. BT says a working line can be up and running within a couple of days, but a new line usually takes up to 15 working days (checked 20 November 2026).

Always plan around the date your provider confirms, not a general average. The wait depends on whether you are switching or getting a new line, which network you are on, and whether your home already has a socket or fibre box. Our postcode checker shows which deals are available where you live. It cannot promise an installation date, because the provider books that when you order.

If you buy through some links on this page we may earn a commission. It never affects which options we recommend or the order we list them in. How we make money.

How long each type of installation takes

  • →Switching provider at a home that is already connected. Your new provider arranges the switch and you can ask for a preferred date. Any loss of service should last no more than one working day (Ofcom).
  • →A working line, new provider or new home. Up and running within a couple of days, says BT.
  • →A brand new line. Usually up to 15 working days, says BT.
  • →Virgin Media. When you move, a self-install can take as little as 3 days, and an engineer installation usually takes around 7 to 14 days (Virgin Media).
  • →5G home broadband. No landline and no engineer. Three says orders placed before 8pm arrive the next working day (Three).
  • →A new build. Usually full fibre with a fibre box already fitted, but most providers need the connection to be ready before they take an order, and timescales vary (Openreach). Check with the developer and your provider. See broadband deals for a new home.

The visit itself is quicker than the wait. Openreach says most full fibre installations take between one and four hours on the day (Openreach). See which full fibre deals are available at your postcode.

What can slow an installation down

  • →Extra work outside, such as clearing blocked ducts, which can make the appointment longer (Openreach).
  • →Complex work that means the engineer has to come back another day to finish (Openreach).
  • →A survey first, if your property has unusual access requirements (Openreach).
  • →No one over 18 at home, or no landlord permission for drilling if you rent (Openreach).
  • →No line at all yet, which may mean installation work before your provider can connect you (Openreach).

If your installation is late

Under Ofcom's automatic compensation scheme, if your provider promises to start a new service on a date and misses it, you get £6.46 for each calendar day of delay. If an engineer does not turn up, or cancels with less than 24 hours' notice, you get £32.31 per missed appointment. You do not need to ask. These are the amounts on Ofcom's page on 20 November 2026.

Ordering around a moving date

Order as soon as you know your moving date. Sky asks for 2 to 4 weeks' notice and says a move can take up to 10 working days (Sky). Virgin Media says new customers can book up to 60 days ahead (Virgin Media). Our guide to broadband when moving home explains whether to keep your deal or switch. See broadband deals when you move home.

What happens on the day

For full fibre, the engineer runs a cable from a nearby pole or underground duct, brings it in through a small hole in the wall and fits a box called an ONT inside. Your router plugs into it, so it needs to be near a double power socket. The engineer then tests the line (Openreach). If your installation is self-install, follow your provider's instructions, and only use your own router if your provider says you can.

If you already know your provider

The bookable installation date is shown when you order with the provider, not on our deal cards. See our pages for BT, Sky and Virgin Media, or read how broadband switching works.

Frequently asked questions

How long does a full fibre installation take?

Openreach says most full fibre installations take between one and four hours on the day, depending on the property and how the fibre is routed. Extra work, such as clearing blocked ducts, can make it longer, and complex jobs may need a second visit. The wait for an appointment is separate, so use the date your provider confirms.

How long does a broadband switch take if I already have a service?

If your home already has a working line, BT says it can be up and running within a couple of days. When you switch, Ofcom says your new provider arranges it, you can ask for a preferred date, and any loss of service should last no more than one working day. Your new provider confirms the exact date.

Can I get broadband installed in a week?

Often, if your home already has a working connection. A brand new line can take longer: BT says up to 15 working days, and Virgin Media says an engineer installation usually takes around 7 to 14 days. 5G home broadband needs no engineer, and Three says orders placed before 8pm arrive the next working day.

Do I need to be home for the engineer?

Yes, if your installation needs an engineer. Openreach says someone over 18 must be there to give access and agree where equipment goes. If you rent, you need your landlord's permission for any drilling. If the engineer does not turn up, Ofcom's automatic compensation scheme pays £32.31 per missed appointment.

How long does broadband take in a new build?

It depends on whether the connection is ready. Openreach says new build homes typically come with full fibre and a small box called an ONT already fitted, but most providers need the connection to be ready before they accept an order. Ask the developer when it will be live, then check with your provider.

Get the best deals by email

The week's best deals, straight to your inbox. Unsubscribe anytime.

We use essential cookies, plus analytics only if you accept. Cookie policy